Wednesday, February 26, 2020
The Conflict Of A Cut Above And Angel Case Study - 6
The Conflict Of A Cut Above And Angel - Case Study Example This is the ââ¬Å"storyâ⬠of the caseââ¬â¢s progress in the courts, from the time the plaintiff filed its complaint in court, to the appeal to the court that made the final decision in the case. The procedural history of this case is the following. On July 8, 2008, Angel and Cut Above entered into a contract for the sale and purchase of a specialized crane. Pursuant to the contract Cut Above is to pay Angel $100,000.00 for the manufacture of a crane with special hydraulics that will assist Cut Above in constructing its clientââ¬â¢s addition over the water, as the hospital is located on a Pensacola inlet, and the rehabilitation center is to be housed in the new addition. â⬠¨Ã¢â¬ ¨Cut Above paid Angel a deposit of $50,000.00 with the remainder to be paid to Angel upon delivery of the crane, per specifications, on January 15, 2010. January 15, 2010, came and went and the crane did not arrive. The failure of the crane to arrive set the project back initially by one week. Following a conversation with Angelââ¬â¢s executive Cut Aboveââ¬â¢s understanding from the executive was that the crane would not be completed until January 31, 2010, at which time it was to be shipped via truck FOB the construction site. â⬠¨Ã¢â¬ ¨There is a provision in Cut Aboveââ¬â¢s contract with its client, Pensacola Memorial Hospital, that the project was to be completed by March 30, 2010, and that every day the project was delayed past that time, Cut Above would be assessed $500.00 per day, said assessment is deducted from the hospitalââ¬â¢s final payment. Cut Above was charged $3,500.00 for a 7-day delay. â⬠¨Ã¢â¬ ¨Based on the foregoing Cut Above rented a crane to complete as much of the project as possible until the specialized crane arrived from Angel. The crane arrived on February 4, 2010, and Cut Above accepted delivery of the crane but withheld from its final payment to Angel its cost of renting another crane, as well as anticipated delay costs on the project.
Monday, February 10, 2020
Network Design Essay Example | Topics and Well Written Essays - 750 words
Network Design - Essay Example In the following section a description of both physical and logical design is given to clearly define the distinction between these two approaches. logical network design refers to the logical addressing used to describe the network or the networks it connects to. A logical network design displays the IP Addresses linked with each component of the network as shown in fig. 2. In most cases, the logical network is a simple Class C network such as 192.168.0.0 with the default subnet mask of 255.255.255.0. This network allows up to 254 hosts to be connected directly to it without the need of any routing. The following are important factors involved in logical network design. Information about client Kinds of Services or Applications Will the Network Offer Choice of LAN Protocol The information and assessment about the work patterns for various clients is an important factor in logical network design. It helps to appropriately place servers, high- bandwidth links, and other such things in the appropriate physical location of the network. For example if any client (either a single work station or a group) contributes a major portion of the network traffic, then it is necessary to provide that client with a large data pipe. The second important point to be considered in networkââ¬â¢s logic design is the kinds of services or applications that a can offer. Typical network applications today include FTP, telnet, and, of course, browsing the Web. Since each application has potential security problems, hence logical network design also addresses the potential security risks. The choice of LAN Protocol is also decided in logical network design. Today the de facto protocol of choice has to be TCP/IP.
Subscribe to:
Posts (Atom)